Bookings & Enquiry : 09987058829

PRE-CONSTRUCTION TERMITE CONTROL SERVICES

PRE-CONSTRUCTION TERMITE CONTROL SERVICES

Pest Covers - Subterranean Termites

The principal of the treatment is to create a chemical barrier below and around the building so as to deny entry to the termites into the buildings.

Best Pre Termite Pest Control Service In Mumbai, Navi Mumbai, Thane, Andheri, Mulund, Vashi, Dadar, Borivali, Bandra, Kandivali, Goregaon, Kalyan, Dombivli, Badlapur, Panvel, Nerul, Kharghar, Thane East-west, Pune, Delhi, Bangalore, Nashik. We Do Herbal Pest Control, Commercial Treatment, Residential And Pre Termite Pest Control. 100 % Garuntee And Expertize Work. ISO 9001 Certified Company.

Treatment for without basement Buildings

The treatment will commence after the foundation and the plinth wall construction is completed.

  1. Treatment to top surface of plinth filling :
  2. After the soil filling is completed in the plinth area and before the dry rubble packing, the entire surface of the filled soil and the top surface of plinth wall/beam shall be treated with the chemical emulsion at 5 litre per sq.m.

  3. Treatment at junction of wall and floor :
  4. Rodding shall be carried out along the junction of wall and soil filling at 1 mtr. Intervals down up to 30 cm. emulsion shall be sprayed along the wall junction at 1 litre pre linear metre so that it mixes thoroughly with the broken-up soil. The disturbed earth is then tamped back in place.

  5. Treatment of soil along external perimeter :
  6. The soil around the external perimeter of the building up to a depth of 30 cm shall be treated at 2.25 litres per linear meter of the plinth wall.

  7. Treatment of soil surrounding pipes, wastes and conduits :
  8. When pipes, wastes and conduits enter the soil inside the area of the foundation, the soil surrounding the point of entry must be loosened around each such pipe, waste or conduit for a distance of 15 cm and upto a depth of 7.5cm and loosened soil shall be treated with chemical emulsion.

  9. Chemical used:
    1. Imidacloprid 30.5% SC- @ 2.1ml/liter of water.
    2. Chlorpyriphos 20% EC- @ 50ml/liter of water.

Treatment for with basement Buildings

The treatment starts when the excavation is complete and before lying soiling and pcc

  1. Treatment to soil below raft :
  2. After the soil filling is completed in the plinth area and before the dry rubble packing, the entire surface of the filled soil and the top surface of plinth wall/beam shall be treated with the chemical emulsion at 5 litre per sq.m.

  3. Treatment to soil along the retaining wall:
  4. The soil coming in contact with the retaining wall shall be treated at 5 litre per sq.m. the treatment shall follow the backfilling is done in stages of 30 cms but not exceed a depth of 1 meter.

  5. Treatment to soil along the external perimeter of the building:
  6. The soil around the external perimeter of the building up to a depth of 30 cm shall be treated at 2.25 litre per linear meter.

  7. Treatment of soil surrounding pipes, wastes and conduits:
  8. When pipes, wastes and conduits enter the soil inside the area of the foundation, the soil surrounding the point of entry must be loosened around each such pipe, waste or conduit for a distance of 15 cm and upto a depth of 7.5 cm and loosened soil shall be treated with chemical emulsion.

  9. Chemical used:
    1. Imidacloprid 30.5% SC- @ 2.1ml/liter of water.
    2. Chlorpyriphos 20% EC- @ 50ml/liter of water.

Book by phone

09987058829 Monday to Sunday 10.00am - 10.00pm

Contact us



Why Pesto Free Pest Control Services?

  • 17 days/week complaint service.
  • 2Warranty on stamp paper for Pre- Construction Anti Termite Control Treatment.
  • 3Reliable, Friendly and Punctual service.
  • 424/7 Customer support.
  • 5Free spot treatment if an treatment occurs during the contract period.
  • 6Providing Pest Control Services since 2010.
  • 7Highly trained and Certified technicians.
  • 8Free inspection and Quotation.
  • 9Use of advanced herbal gel treatment for cockroach and ants control.
  • 10Maintaining Audit reports as per the requirement.
  • 11An integrated pest management approach to pest management.
  • 12Use only chemicals that are approved by Central Insecticide Board of India.
  • 13Free Integrated Pest Control training programs for Commercial and Residential Clients.